Installer
I. Installation of clean room panels
• Scaling positions for placing panels with a laser meter according to the blueprint and plan given by the design team-according to the project (knowledge of reading project drawings).
• Placement of guides and U-profiles according to the drawn positions (base for the panel)
• Placing the panel:
o Smaller panel 3x1. 2m weighing up to 75kg
o Larger panels up to 12m high - lifting by robotic arm and vacuum
The panels are screwed into each other.
•...